Seven Generations – Gold Creek » Gas Liquids Engineering Ltd.
The plant will be built in multiple phases. Phase 1 consists of two separate processing plants; Plant 1 and Plant 2. Each plant will have the ability to process 250 MMSCF/d of gas (500 MMSCF/d total), and 10375 bbl/d of natural gas liquids (NGL''s) (20750 bbl/d total).