Attachment 9 Mine Plan of Operation
via water trucks to be used with the secondary batch plant. 4. Water will be used to wash sand if required for the onsite concrete plant. Currently, there is one claylined pond constructed on the mining premises. This will be reactivated and used for the purpose of storage and recycling of wash water, as well as to contain the fine